Domov >> Izdelki >> Zasnova in izgradnja preizkuševalne postaje za električne transformatorje>> Zasnova in izgradnja preizkuševalne postaje za električne transformatorje

Zasnova in izgradnja preizkuševalne postaje za električne transformatorje

Nanke Electric Nanke Electric建设 Nanke Electric设计

To je celotna storitev načrtovanja in gradnje preskusne postaje za električne transformatorje, ki lahko izvede preskusno postajo za transformatorje v vseh napetostnih razredih od 4,16 kV do 1000 kV ter zagotavlja celovito storitev od zgodnjega načrtovanja in projektiranja do izvedbe ter opremo s kompletnim naborom naprav, kot so generatorji udarja strele, testi oljne kemije, testi lokalnih praznitev in zaščitene sobe.

Podrobnosti o izdelku

I. Custom Design:

We provide the most optimized test station design based on your specific requirements, site conditions, and international standards (IEC60076/IEEE C57.12.90-2021). This includes intelligent transformer testing, high-voltage testing hall, partial discharge noise testing room, oil testing room, and more.

II. Voltage Levels Covered:

6kV to 1000kV

III. Manufacturing:

Based on the specifications of the test station, we strictly customize and manufacture dedicated test equipment components and auxiliary tools that meet technical requirements.

IV. Installation and Commissioning:

Our service team provides comprehensive services from the construction of the testing hall to equipment installation, wiring, and commissioning, ensuring smooth system commissioning. This includes the construction of the main body of the test station (construction of the control room and equipment room), installation of electrical equipment (test benches, control cabinets, test transformers, variable frequency power supplies, measuring instruments, etc.), cable laying, grounding system construction, and installation of safety warning signs.

V. Comprehensive Training and Support:

We provide in-depth operation and maintenance training for your team and offer technical support services throughout the equipment’s operational cycle.